Skip to Main Content
Cloud Platform


This is an IBM Automation portal for Cloud Platform products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.


ADD A NEW IDEA

Pinned ideas

PINNED Terminal emulator support on Docker image
Docker utility should support Functional Perspective test scripts. Slack Issue https://devops---testing.slack.com/archives/CGV8AAGCD/p1645022341509149

All ideas

Showing 834

all owners not receiving email notifications for asset access requests

currently, only lifecycle mgrs receive email notifications for asset access requests. per issue #3788, this can be solved if a community admin enables a feature to include asset owners as lifecycle mgrs. however, the feature will be enabled for AL...
about 10 years ago in Rational Analysis, Design & Construction / Asset Manager 7 Future consideration

Recommend a HA configuration

Any enterprise deployment of a solution that includes RAM will require high availabity . There is no installation instructions nor documented way to set up RAM in an HA configuration. There is a tech note (https://www-304.ibm.com/support/docview.w...
about 10 years ago in Rational Analysis, Design & Construction / Asset Manager 2 Future consideration

Extended Emailing Feature for Query Resultset

Add the ability to send email directly from CQ records, Selecting 'Send E-Mail' would result in: - Outlook message opening with record details in Body - To: field would be auto-populated with Owner, Originator, Project Leads - Headline would be th...
about 5 years ago in ClearCase and ClearQuest / ClearQuest 1 Future consideration

P2 install option for IDEs

Should offer both IM and p2 install options like RTC does. IBM comments: a) this RFE pertains to all IDEs (RDz, RDi, ...), not just to RAD b) some things to consider as the community evaluates this RFE, or suggests variants of it: if we offered th...
over 10 years ago in Rational Analysis, Design & Construction / Application Developer 3 Future consideration

Web Browser Usage not possible due to deprecated XMLHttpRequest

Due to deprecated XMLHttpRequest the usage of CQWeb in current Browser-Versions is no longer possible. For further Information about XMLHttpRequests please see: https://xhr.spec.whatwg.org/#the-open()-method
about 5 years ago in ClearCase and ClearQuest / ClearQuest 10 Future consideration

Element ordering within Web publish is not according to project explorer preferences.

Element ordering within a web publish model is not according to the Project Explorer preferences; it always displays it in storage order.
over 15 years ago in Rational Analysis, Design & Construction / Software Architect Designer 2 Future consideration

SAP RFC recording using RIT

We have problems with recording SAP RFC events with RIT. We created a PMR (https://www.ibm.com/mysupport/s/case/500500000162giOAAQ/sap-system-connectivity) with IBM and only way by which we can do this is by injecting java agent in to our server w...
about 5 years ago in Rational Automated Software Quality / Virtualization Server 1 Future consideration

Comment field in CQ Queries

In the ClearQuest Queries we need a additional field to add a comment.
about 5 years ago in ClearCase and ClearQuest / ClearQuest 1 Future consideration

Add possibility to open message.log and trace.log from Admin Center

It would very interesting to have the possibility to open message.log and trace.log from Admin Center.Like the Include member in server.xml, we can opening theses members directly from Admin Center.
about 5 years ago in WebSphere Liberty 1 Future consideration

perspective switcher positions

Perspective switcher no longer on seperate bar with left right location option.In version 9 it can only be dragged to the start of the main bar where it is already crowded with other icons of different size.It is a function which is most frequentl...
over 10 years ago in Rational Analysis, Design & Construction / Application Developer 2 Future consideration